Logo image
Biomass harvesting in Eucalyptus plantations in Western Australia
Journal article   Peer reviewed

Biomass harvesting in Eucalyptus plantations in Western Australia

Mohammad R Ghaffariyan, Mark W Brown, Mauricio Acuna, J Sessions, M Kuehmaier and J Wiedemann
Southern Forests, Vol.73(3/4), pp.149-154
2011
url
https://doi.org/10.2989/20702620.2011.639491View
Published Version

Abstract

biomass chipper eucalypt plantation feller-buncher productivity skidder
Australia is at an early stage of exploring the use of forest biomass to generate energy. This study evaluated the biomass yield and the productivity rates of equipment for harvesting biomass in a poor-quality eucalypt plantation. The operation consisted of a tracked feller-buncher, grapple skidder and mobile chipper. Time study methods were used to measure the harvesting operation. A multiple regression model was constructed to predict skidding productivity. Biomass production was 63.9 t ha-1 based on the recorded load weight of eight trucks. Delays were documented and analysed. The average delay for all equipment was about 30% of working time. The study results will help guide biomass harvesting managers to estimate productivity and cost of similar operation sites.

Details

Metrics

1 File views/ downloads
702 Record Views

InCites Highlights

These are selected metrics from InCites Benchmarking & Analytics tool, related to this output

Collaboration types
Domestic collaboration
International collaboration
Web Of Science research areas
Forestry

UN Sustainable Development Goals (SDGs)

This output has contributed to the advancement of the following goals:

#7 Affordable and Clean Energy
#13 Climate Action

Source: InCites

Logo image