Sign in
A cost-benefit analysis of pre-sorting using a feller-buncher in underdeveloped short rotation poplar plantations
Journal article   Open access   Peer reviewed

A cost-benefit analysis of pre-sorting using a feller-buncher in underdeveloped short rotation poplar plantations

Raffaele Spinelli, Natascia Magagnotti, Barnabáš Kováč, Patrik Heger, David Heilig, Bálint Heil, Gábor Kovács and Matevž Mihelič
International Journal of Forest Engineering, Vol.34(1), pp.90-99
2023
pdf
A Cost-benefir analysis of pre-sorting using a feller buncher431.36 kBDownloadView
Accepted VersionCC BY-NC-ND V4.0 Open Access
url
https://doi.org/10.1080/14942119.2022.2107863View
Published Version

Abstract

cost CTL log recovery Multi-tree Productivity WTH

Details

Metrics

2 File views/ downloads
50 Record Views

InCites Highlights

These are selected metrics from InCites Benchmarking & Analytics tool, related to this output

Collaboration types
Domestic collaboration
International collaboration
Web Of Science research areas
Forestry

UN Sustainable Development Goals (SDGs)

This output has contributed to the advancement of the following goals:

#7 Affordable and Clean Energy
#13 Climate Action
#15 Life on Land

Source: InCites